
New flooring
the foundation of every room
Floors take more abuse than any other surface in a Texas home. We match the material to the room and the household, prepare the slab properly and install it so it stays flat and quiet.
Request an estimate- Materials
- Tile, hardwood, engineered, vinyl plank
- Slab prep
- Leveled and moisture tested
- Whole home
- One floor, clean transitions
What flooring includes
Every trade. One team.
A floor lasts as long as the work underneath it, so each of these is part of the job.

- 01
Material selection
Wood-look porcelain tile, hardwood, engineered wood, luxury vinyl plank or carpet, matched to pets, kids and sun exposure.
- 02
Removal and disposal
Old carpet, tile and laminate taken out, thinset ground off and the debris hauled away.
- 03
Subfloor preparation
Slabs leveled and moisture tested, cracks addressed and underlayment set so the floor stays flat.
- 04
Installation
Layout planned from the main sightline, large-format tile set with a leveling system, planks laid with staggered joints.
- 05
Stairs and transitions
Stair treads, nosings and transitions between rooms finished so the whole floor reads as one.
- 06
Baseboards and cleanup
Base and shoe molding reinstalled or replaced, caulked and painted, and the house left clean.
Our ten-step process, condensed
From first meeting to walkthrough.

Meet and measure
We measure each room, check the slab and talk through materials and how you live on your floors.

Design and selections
Samples come to the house so you see them in your light, and the estimate covers prep and trim.

Build
Removal, subfloor prep, installation and trim, one area at a time so you keep use of the house.

Walkthrough and warranty
We walk every room with you, check transitions and grout, and warranty the installation.
Questions
Before you call.
- What flooring holds up best in Collin County homes?
- Wood-look porcelain tile and luxury vinyl plank handle dogs, kids and humidity swings best. Hardwood and engineered wood are beautiful in living areas but need a stable slab and a little more care.
- How long does a flooring installation take?
- A single room typically takes one to three days. Whole-home installs most often run one to two weeks depending on the material, with tile taking longer than plank.
- Do I need to move out during the install?
- Rarely. We work room by room and move furniture as we go, so you keep use of most of the house. Whole-home tile is the one case where a few nights elsewhere makes the job faster.
- Can you put hardwood on a concrete slab?
- Yes, with engineered hardwood glued to a properly prepared slab, or solid hardwood over a plywood subfloor. We moisture test the slab first, since North Texas slabs can hold moisture after a wet spring.
Often paired with flooring

Ready to start?
Start your flooring project
Request an estimate and we call within one business day.
Request an estimate



